12.5 MMSCFD NiTech® NRU facility that includes condensate extraction, integrated NGL extraction, and mole sieve dehydration. Facility includes an auxiliary refrigeration system to augment NGL extraction. (The NiTech® process is a BCCK patented process design)
100 MMSCFD cryo plant utilizing Ortloff’s RSV process. BCCK’s full EPC scope includes integrated condensate extraction, inlet separation, propane refrigeration, amine, dehydration, power distribution system, control system/HMI console, all facility utilities, and on-site construction. The cryogenic gas expander plant utilizes a BCCK process design and is operational and meeting all specifications and guarantees.
12 MMSCFD nitrogen rejection unit using NiTech® technology for coal mine methane application. (Replacement due to severe tornado damage to the original facility) Project included the completion of structural skid fabrication, supply and installation of the required NiTech® NRU interconnecting piping, valves and fittings, supply and installation of the inlet gas dehydration system, and supply and installation of the required instrumentation including a computer-based PLC control system. BCCK’s full EPC scope included field installation.
75 MMSCFD cryo gas plant utilizing the GSP expander technology. BCCK’s full EPC scope included integrated condensate extraction, inlet separation, propane refrigeration, amine, dehydration, control system/HMI console, all facility utilities and on site construction. This cryogenic gas expander plant was designed as client’s standard 75 MMSCFD facility. The facility utilizes a BCCK process design and is operational and meeting all specifications and guarantees. Scope also included power distribution system, control system, fabrication and installation.
60 MMSCFD cryo plant utilizing a BCCK designed GSP process. The facility was designed to operate in ethane rejection or ethane recovery mode and was designed as a standard for this client. BCCK’s full EPC scope includes integrated condensate extraction, inlet separation, propane refrigeration, BCCK designed and built amine unit, all facility compression, power distribution system, control system/HMI console, NGL Storage, loading, and unloading, all facility utilities, and on-site construction. The cryogenic gas expander plant utilizes a BCCK process design and is operational and meeting all specifications and guarantees.