Reagan County, Texas Project #2814

200 MMSCFD 1440 PSIG HARP style slug catcher and associated 90,000 gallon condensate stabilizer feed vessel. BCCK scope includes installation drawings and foundations designs.

Payne County, Oklahoma Project #0914

66 MMSCFD nitrogen rejection facility using Style III NiTech® technology for processing nitrogen on the residue of a new cryo plant in central Oklahoma. This facility also includes BCCK’s new vent stream purifier for ultra-low methane emissions. (The NiTech® process is a BCCK patented process design.)

Nolan County, Texas Project #5813

15 MMSCFD NiTech® NRU including integrated NGL extraction, propane refrigeration, mole sieve dehydration, power distribution, plant control system, transportation and installation.  (The NiTech® process is a BCCK patented process design)

Sterling County, Texas Project #0412

Refurbished 43 MMSCFD nitrogen rejection facility using NiTech® technology for associated nitrogen field post cryogenic NGL processing. Project deals with a relatively low inlet nitrogen content of less than 6.0 mole % nitrogen. (The NiTech® process is a BCCK patented process design)

Andrews County, Texas Project #5611

60 MMSCFD cryo plant utilizing Ortloff’s RSV process. BCCK’s full EPC scope includes integrated condensate extraction, inlet separation, propane refrigeration, amine, dehydration, power distribution system, control system/HMI console, all facility utilities and on-site construction. The cryogenic gas plant utilizes a BCCK process design and is operational and meeting all specifications and guarantees.