

Project Description
BCCK was contracted to install a 12 MMSCFD Nitech™ NRU to process coal mine methane reserves located near Marion, Illinois. The project includes H2S removal, oxygen removal, inlet gas dehydration, CO2 extraction and nitrogen rejection. Unlike the other CMM enrichment facilities previously installed by BCCK, this facility was placed on an abandoned coal mine where active mining had been ceased for several years.
Project Profile: Marion, IL
Facility Size: 12 MMSCFD
Plant Type: Coal Mine Methane
Inlet Gas N2 Content: 15% – 30%
Completion: July 2002
Download Case Study in PDF format