Nitech NRU Project
chunchula, alabama
PROJECT SPECIFICATIONS
Plant Location: Chunchula, AL
Facility Size: 20 MMSCFD
Plant Type: Nitrogen Flood, NGL Separation
Inlet Gas Content: 18-40 mole % N2
Project Type: Sale
Completion: June 2002
PROJECT DESCRIPTION
The client is located north of Chunchula, Alabama. In 2002, UNOCAL chose BCCK’s Nitech™ NRU process to reject increasing concentrations of nitrogen from an associated nitrogen flood in order to generate additional revenue and increase profits. The patented Nitech™ NRU was selected because it was the most cost effective method to reduce inlet nitrogen volumes, due to flexibility and the CO2 tolerance of the Nitech™ process. This flexibility and CO2 tolerance allowed the Nitech™ process to be integrated with the existing facility without modifying processes, while also providing an additional benefit of increased NGL recoveries. Since mid 2002, the Nitech™ system has operated continuously and the Chunchula plant is efficiently producing an on-spec stream of saleable gas.
Download PDF
OTHER Project Profiles
- ALABAMA - 20 MMSCFD
- NORTH DAKOTA - 43 MMSCFD
- OKLAHOMA - 48 MMSCFD
- TEXAS - 15 MMSCFD
- wyoming - 200 MMSCFD

